ACC 300 Assignment 6 ACC 300 Assignment 6 Haga clic para leer
  • Comentarios

ACC 300 Assignment 6

ACC 300 Assignment 6

Publicado el en “Diseño, Arquitectura”, Idioma — English. 6 páginas.
1. Problem 6-2 A manager wants to assign tasks to workstations as efficiently as possible, and achieve an hourly output of 331/3 units. Assume the shop works a 60-minute hour. Assign the tasks shown in the accompanying precedence diagram (times are in minutes) to workstations using the following rules 2. Problem 6-3 A manager wants to assign tasks to workstations as efficiently as possible, and achieve an hourly output of Más
Suscríbase GRATIS